dietcokeaddict
11-13-2004, 11:22 PM
I am SO relieved!! He needs to figure out his schedule for Dec. & Jan and will get back to us regarding when he will be able to start. He did say he could have it done by the end of the yr, but we'll see...
We bought our sink fixture and are going to order the bath/shower one soon. That is special order because of the bathtub being a clawfoot tub. We also got the light that will go above the med.cabinet and the tile for the floor. Tuesday we are taking the tub to be refinished and should get that back the week after Thanksgiving.
I still need to strip the paint off of the medicine cabinet door & 2 drawers (we are having a cabinet custom made to fit the door and 2 drawers that go under it.). But that's it! I REALLY miss not having a bathtub right now and can't wait until this bath renovation is over!
I'll be sure to post before/during/after pics once we get going!
We bought our sink fixture and are going to order the bath/shower one soon. That is special order because of the bathtub being a clawfoot tub. We also got the light that will go above the med.cabinet and the tile for the floor. Tuesday we are taking the tub to be refinished and should get that back the week after Thanksgiving.
I still need to strip the paint off of the medicine cabinet door & 2 drawers (we are having a cabinet custom made to fit the door and 2 drawers that go under it.). But that's it! I REALLY miss not having a bathtub right now and can't wait until this bath renovation is over!
I'll be sure to post before/during/after pics once we get going!